1. <acronym id="hz5jk"><strong id="hz5jk"><address id="hz5jk"></address></strong></acronym>
    2. <p id="hz5jk"></p>
        <big id="hz5jk"><ruby id="hz5jk"><menu id="hz5jk"></menu></ruby></big>
        <object id="hz5jk"><nav id="hz5jk"><noframes id="hz5jk">

        Copyright © 2019 东营市信诚石油技术有限责任公司 版权所有,违权必究 | 鲁ICP备14011269号-1 | 官方网站建设:中企动力淄博分公司
        • 01
        • 02

        产品中心

        分级箍

        产品名称

        分级箍

        产品简介:

         

        点击新窗口打开大图

         

        双级注水泥器附件

          STAGE CEMENTER PLUG SYSTEM
         
        MSC-A型和HSC-A型双级注水泥器附件包括:挠性塞、重力型打开塞(简称重力塞)、关闭塞、碰压座、顶替型打开塞(简称顶替塞)。这些零件由胶塞及铝合金材料制成,均具有良好的可钻性。
         
        关闭塞
        Closing Plug
         

        The accessories of MSC/HSC Stage Cementer include a first-stage plug, free-fall opening plug, closing plug, shut-off baffle and pumping-down opening plug. Being made of rubber or aluminum, these parts are drillable.

         
         
        1、碰压座用于挠性塞碰压,一般放置于浮箍以上的一根套管接箍中。
        2、挠性塞用于隔离水泥浆和钻井液,第一级替量到位后,形成碰压。
        3、重力塞为流线形,内部装有铅,投塞后快速自由下落至下滑套上并形成密封。憋压后打开循环孔。
        重力型打开塞
        Free-fall Opening Plug
         

        4、关闭塞用于隔离第二级水泥浆钻井液,当其运行至上滑套位置时形成密封。继续加压,关闭套下行,循环孔关闭。

        5、顶替型打开塞用于连续式双级注水泥作业,也适用与在斜井中使用。它可直接打开循环孔,而不像重力塞那样需要较长等待下落时间。
         
        1. The shut-off baffle is installed in the casing collar, one joint above the float collar.

        1.     

        挠性塞
        First-Stage Plug
         

        The first-stage plug is used to isolate the first-stage cement and drilling fluid. On the end of displacement,the first-stage plug lands and effects a seal against the shut-off baffle.

        3. Featuring streamline shape and filled with lead, the free-fall opening plug can quickly free-fall to the lower sliding sleeve. When pressure is applied to the casing, it can open the circulation ports.
        碰压座
        Shut-Off Baffle
         

        4. The closing plug is used to isolate the second-stage cement and drilling fluid. When running to the upper sliding sleeve, it effect a seal in the stage cementer. Pressure is applied to the casing and the circulation ports are closed.

        5. The pump-down opening plug is used for continuous cementing operation and in deviated wells. It can open the circulation ports directly and quickly, whereas the free-fall opening plug needs longer time waiting for falling.
        顶替型打开塞
        Pumping-Down Opening Plug

         

         

         

        未找到相应参数组,请于后台属性模板中添加
        暂未实现,敬请期待
        暂未实现,敬请期待
        关键词
        上一篇
        下一篇
        3D裸体被强奷动漫
          1. <acronym id="hz5jk"><strong id="hz5jk"><address id="hz5jk"></address></strong></acronym>
          2. <p id="hz5jk"></p>
              <big id="hz5jk"><ruby id="hz5jk"><menu id="hz5jk"></menu></ruby></big>
              <object id="hz5jk"><nav id="hz5jk"><noframes id="hz5jk">